VK6RAV
- AVON
VALLEY
REPEATER -
147.275MHz
Operational details of local repeater
VK6RAV.
HOME > OPERATIONAL
>
LOCAL
REPEATERS >
Technical
Output
Frequency (MHz) :
147.275
Input
Frequency (MHz) :
147.875
Power
(Watts) :
20W
Time
Out :
3 min
CTCSS
Access (Hz) :
Open
Latitude
:
-31.63559928
Longitude
:
116.49225623
Location:
HASL
(m) :
430
The above radiation foot-print was produced using
Radio Mobile
See comparative information of former
site at Crowns Nest Hill
Site and
equipment information.
Photo
1 Equipment rack as at 14 November 2024
Fig
1 Single line diagram of equipment arrangement as at 14 November
2024.
Broadband
Link
Fig
2 The above Link Study for the 5.2GHz broadband link
between the VK6RAV repeater site and Northam was produced using
Radio Mobile
Link
Study Performance
Distance:
18.6 km
Precision:
10.0 m
Frequency:
5200.0 MHz
Equivalent
Isotropic Radiated Power:
87.916 W
System gain:
186.46 dB
Required reliability:
90.000 %
Received Signal:
-75.46 dBm
Received Signal:
37.76 μV
Installed
Ubiquiti link status measurement.
54m site
tower (Worlds tallest / skinniest tower).
21 July 2026.
5.2GHz broadband
Ubiquiti link antenna. 21 July 2026
Town
of Northam 15km to the east of the VK6RAV site. 21 July 2026
Tower guy wires
Fig
3 Tower guy wire details
Guy
wire group
Distance
from tower base to ground attachment (Mtr)
Tower
attachment above ground (Mtr)
Guy
wire length (Mtr Rounded up to 3 decimal place)
Guy
wire length plus 5m termination tails (Mtr Rounded up to 1
decimal place)
1
20.22
4.790
20.780
25.8
2
20.22
9.280
22.248
27.3
3
20.46
13.770
24.663
29.7
4
20.46
18.260
27.424
32.5
5
20.72
22.750
30.772
35.8
6
20.72
27.240
34.225
39.3
7
30.16
31.730
43.777
48.8
8
30.16
36.220
47.133
52.2
9
30.4
40.710
50.809
55.9
10
30.4
45.200
54.473
59.5
11
30.66
49.690
58.388
63.4
12
30.66
54.180
62.254
67.3
Table
1 Tower guy wire details
Jim (VK6CA) Setting
the tower guy wire tension. 24 May 2014
Site
and equipment photos: VK6RAV PHOTOS
Some
works that have been completed at the VK6RAV site.
2014
Project to replace deteriorated tower guy wire and install new 2m
band co-linier antenna: vk6rav_maintenance_2014.htm
May 2024
project to upgrade the DC distribution board: dc_distribution_vk6rav20240514.html
March 2025
project included a DC line filter to attenuate regulator noise: VK6RAV DC Line Filter
VIDEO
Video of
the VK6RAV general site and tower.
TOP
OF PAGE
Page initiated 1 July,
2014
Page
last revised 12 September, 2026